After the floods in the centre of Leeds in 2016, Paul Owen Associates were commissioned to review and provide flood risk measures to this existing site . It was determined that the existing site would be protected to a 1 in 200 year event based on detailed discussions with the client and the Environment Agency.

This challenging project required the installation of over 300m of permanent concrete walls and temporary protection systems which could be easily deployed on site if required. In addition, the project required the installation of protection measures to both the existing foul and surface water drainage system.

 

Key Facts

  • drainage alterations
  • installing flood protection within an occupied site
  • detailed discussions with both the planners and environmental agency

Services we offer

Structural engineering

Pre-planning advice

Due-diligence advice

Arrangement of geo-environmental studies

Civil engineering

Masterplanning

Flood risk assessments

Below ground drainage

Monitoring/project management

Feasibility studies