Get in Touch: 020 3176 7726

Morgan Stanley – London

Sector: Commercial & Industrial Project: 3 of 4

Paul Owen Associations acted as the Structural Engineers on this significant upgrade of the existing head office of Morgan Stanley in Canary Wharf.

The project included a significant  upgrade to the existing service and the inclusion of new roof plant structures and adaption of existing plantrooms. The refitting  included the upgrading of a number of the existing office/trading floors and included the installation of a new good lifts and infilling existing stair cores.

Key Facts

  • alterations and strengthening of the existing structure
  • structural review of existing building in relation to new proposals
  • design of new high-level plant enclosure
  • monitoring of works during construction stage of project
  • working within a live office environment

Services we offer

Structural engineering

Pre-planning advice

Due-diligence advice

Arrangement of geo-environmental studies

Civil engineering

Masterplanning

Flood risk assessments

Below ground drainage

Monitoring/project management

Feasibility studies