Both these buildings had to be designed to meet very high design standards and were constructed to meet a number of security requirements.
The Merton project also needing to meet a 20% target for renewable energy use, which required utilizing both extensive PV structures within the car park areas as well as the installation of a wind turbine.
The external hardstandings for both sites had challenges to meet the clients requirements in relation to the external levels or with the requirements of the below-ground drainage systems. In both locations the external works also included the construction of new access roads which were designed to adoptable standards and the remodeling of the highways to enable site access.